An introduction to RAM analysis of EPB tunnel boring machine
Keywords:
EPB – TBM, reliability analysis, availability analysis, maintainability analysisAbstract
Earth pressure balance tunnel boring machines (EPB - TBMs) are favorably used in construction of tunnels in urban areas. These more expensive machines with high operational costs require an exclusive study and knowledge on these machine components and subsystems and their failure and downtimes for time planning, cost control and performance prediction with a high accuracy. Thus guidelines for reliability, availability and maintainability (RAM) analysis of an EPB machine are completely expressed. Gathering and recording all daily failure and repair times and other maintenance tasks, dividing the machine into subsystems (including mechanical subsystem, electrical subsystem, hydraulic subsystem, pneumatic subsystem and water subsystem), graphical tests (trend test and correlation test), statistical tests and analysis are discussed in detail.References
Barabady, J., Kumar, U., 2007. Reliability characteristics based maintenance scheduling, a case study of a crushing plant, Int. J. Perform. Eng., 3(3), 319 – 328.
Barabady, J., Kumar, U., 2008. Reliability analysis of mining equipment, A case study of a crushing plant at Jajarm Bauxite Mine in Iran, Reliab. Eng. Syst. Safe., 93, 647–653.
Barla, G., Pelizza, S.,2000. TBM tunneling in difficult ground conditions, Int. Conf. Geotech. Geol. Eng. Melbourne, Australia.
Barton, N., 1999. TBM performance estimation in rock using QTBM, Tunnels and Tunneling International 31 (9), 30–33.
Birolini, A., 2007. Reliability Engineering, Theory and Practice, 5th edition, Springer., pp.588.
Dhillion, B.S., 2008. Mining Equipment Reliability, Maintainability and Safety, Springer., pp. 209.
Ebeling, C.E., 2010. An Introduction to Reliability and Maintainability Engineering, 2nd Edition, Waveland Press Inc. Illinois., USA, pp. 550.
EFRANCE., 2000. Specification and Guidelines for the use of specialist products for Soft Ground Tunneling, ISBN 09539733-2-8.
Frough, O., Torabi, S.R., Tajik, M., 2012. Evaluation of TBM utilization using rock mass rating system, a case study of Karaj-Tehran water conveyance tunnel (lots 1 and 2). J. Min. Env., 3(2), 89-98.
Hall, R., Daneshmend, L.K., 2003. Reliability and maintainability models for mobile underground haulage equipment, CIM Bulletin., 96, 159-165.
Hall, R., Daneshmend, L. K., 2003. Reliability Modelling of Surface Mining Equipment, Data Gathering and Analysis Methodologies, Int. J. Surf. Min. Reclamat. Env., 17(3), 139-155.
Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J., 2010. Performance prediction of hard rock TBM using Rock Mass Rating (RMR) System, Tunn. Undergr. Sp. Tech., 25, 333-345.
Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., 2009. Development new equations for performance prediction, Int. J. Geo. Mech. GeoEng., 4 (4), 287–297.
Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., Tavakoli, H.R., 2010. TBM performance analysis in pyroclastic rocks, a case history of Karaj Water Conveyance Tunnel (KWCT), J. Rock Mech. Rock Eng., 4, 427–445.
Hassanpour, J., Rostami, J., Zhao, J., 2011. A new hard rock TBM performance prediction model for project planning, Tunn. Undergr. Sp. Tech., 26, 595–603.
Herrenknecht, 2002. North Madrid tunnel project “TBM characteristics and performance.
Hoseinie, S.H., 20111. Modeling and simulation of drum shearers’ reliability at mechanized longwall mines-case study, Ta-bas coal mine, Doctor’s Thesis. Shahrood Univ. Technol.
Hoseinie, S.H., Ataei, M., Khalokakaei, R., Ghodrati, B., Kumar, U., 2012. Reliability analysis of drum shearer machine at mechanized longwall mines, J. Qual. Mainten. Eng., 18(1), 98-119.
Hoseinie, S.H., Ghodrati, B., Kumar, U., 2013. Monte Carlo reliability simulation of coal shearer machine, Int. J. Perform. Eng., 9(5), 487-494.
Jafari, M.J., Gharari, N., Sheikhi, H. R., 2009. The Reliability of a Tunnel Boring Machine, Int. Iran. Occup. Healt. Assoc., 1, 19-24.
Kolymbas, D., 2005. Tunelling and Tunnel Mechanics, Springer-Verlag Berlin Heidelberg., pp 437.
Kumar, U., 1990. Reliability Analysis of Load-Haul-Dump Machines, Ph.D thesis, Lulea University of Technology, Lulea, Sweden.
Kumar, U., Granholm, S., 1988. Reliability Technique, A Powerful Tool for Mine Operator. Miner. Res. Eng., 1, 13-28.
Laughton, C., 1998. Evaluation and Prediction of Tunnel Boring Machine Performance in variable rock Masses” PhD Thesis. Univ. Texas.
Merritt, A., Mair, R., 2006. Mechanics of tunneling machine screw conveyor, model tests. Geotech., 56 (9), 605–615.
NFM Technologies., 2007. Operating and maintenance manual for EPB TBM for TABRIZ.
Peila, D., Oggeri, C., Borio, L., 2009. Using the slump test to assess the behavior of conditioned soil for EPB tunneling, Environ. Eng. Geosci., 15 (3), 167–174.
Pham, H., 2003. Steady-state series-system availability, IEEE Transactions on Re-liability., Vol. 52, No. 2, p. 146-147
Samanta, B., Sarkar, B., Mukherjee, S.K., 2001. Reliability centered maintenance (RCM) for heavy earth-moving machinery in an open cast coal mine., CIM Bull,104–108.
Samanta, B., Sarkar, B., Mukherjee, S.K., 2004. Reliability modeling and performance analysis of an LHD system in mining, J. S. Afr. Inst. Min. Metall., 4(1), 1-8.
Samanta, B., Sarkar, B., Mukherejee, S.K., 2001a. Reliability analysis of shovel machines used in an open cast coal mine, Mineral Resor. Eng., 10(2), 219–231.
Samanta, B., Sarkar, B., Mukherejee, S.K., 2001b. An application of Weibull distribution for reliability study of shovel machine used in a coal mine, MGMI, Trans., 97(1), 77–86.
Samanta, B., Sarkar, B., Mukherejee, S.K., 2002. Reliability analysis of a dragline machine in mine, Indust. Eng. J., 31(12), 18–22.
Sapigni, M., Berti, M., Bethaz, E., Busillo, A., Cardone, G., 2002. TBM performance estimation Using Rock mass Classification, Int. J. Rock Mech. Min. Sci., 39, 771-778.
Stanek, E.K., Venkata, S.S., 1988. Mine Power System Reliability. IEEE Trans. Industry Appl., 24(5).
Wijaya, A., Lundberg, Y., Kumar, U., 2011. Downtime analysis of a scaling machine, Int. J. Min. Reclam. Env., DOI, 10.1080/17480930.2011.603515.
Yagiz, S., Karahan, H., 2011. Prediction of hard rock TBM penetration rate using particle swarm optimization, Int. J. Rock Mech. Min. Sci., 48, 427-433.
Yagiz, S., 2002. Development of Rock Fracture and Brittleness Indices to Quantify the Effects of Rock Mass Features and Toughness in the CSM Model Basic Penetration for Hard Rock Tunneling Machines, Ph.D. Thesis, Department of Mining and Earth Systems Engineering, Colorado School of Mines, Golden, Colorado, USA, pp289.
Yagiz, S., 2007. Utilizing rock mass properties for predicting TBM performance in hard rock condition, Tunn. Undergr. Sp. Tech., 23 (3), 326–339.
Published
How to Cite
Issue
Section
License
Copyright (c) 2014 Hasel Amini Khoshalan, Seyed Rahman Torabi, Seye Hadi Hoseinie, Behzad Ghodrati
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.